Perfobore Increases Production by 2,7X and Steam Injectivity by 1.3X in Carbonates
Heavy oil
Poor vertical steam conformance in the complex geological conditions
Low current reservoir pressure
Heavy oil
Poor vertical steam conformance in the complex geological conditions
Low current reservoir pressure
4 channels 45 ft. length each at different TVD’s to different target intervals
Inclinometry and GR&RES of each channel
Drilled channels have been stimulated by acid using jet gun
Oil increment: 193 bopd
Increasing of PI by 2,7 times
Increasing of steam injectivity by 1.3 times
Increasing of oil production over the first 30 days of 210 bbl/day vs 17 bbl/day before the operation