• Construction
  • Specs
  • Advantages
  • Drilling
  • Options
  • EN
Main
Technology
Company
  • Contacts
LinkedIn
© 2021

Increased oil and gas influx by 40-100%

Scroll down

Retrievable whipstock, re-entry to each lateral

Anchor with re-entry guide

Pre-planned trajectory of the channel

Compact double-bend mud motor

Mechanical PDC drilling

Radial laterals
1-4
At the same TVD
Leteral length
80
ft limit
Lateral OD
2-3/4
inches
Dogleg severity
215
deg per 100 ft
Pre-planned lateral trajectory
Re-entry to each lateral
Applicable in thin pay zones
Access to undamaged zone of formation

Creating a lateral

Anchor setting
Window milling
Drilling

Options

Directional survey

Multipoint deep acidizing

Lateral completion

Hub 71, 14-104, Al Khatem Tower, ADGM Square, Al Maryah Island, Abu Dhabi, UAE
+971 56 370 8857 info@perfobore.com
  • LinkedIn