69 FT. LENGTH CHANNEL CARBONATE

Perfobore Replaces Sidetrack and Significantly Increases Oil Production From a Carbonate Reservoir in Idled Well with Fish

The well had been previously left idle after a failed workover intervention where the production interval was blocked by a dropped ESP. The cost and risk of a fishing operation for the ESP was calculated, as was a full scale drilled sidetrack to re-open the payzone. Both options required the use of costly heavy-drilling rigs, the fishing success wasn’t guaranteed, and the sidetrack was not economic

 

2 channels drilled 69 ft length (DLS=100 deg/100 ft.) each with acid stim performed through a jet sub (V=180 bbl of 18% HCl)

 

Oil increment: 200 bopd

 

 