DEEP WELL, CARBONATE Perfobore Replaces Sidetrack and Significantly Increases Oil Production From a Carbonate Reservoir in Idled Well with Fish
OIL RIMS STIMULATION SANDSTONE Perfobore Increases PI by 6 times and Delivers 200% Production Increase in Carbonates
DRILLING VS ACID FRAC CARBONATE "Perfobore Increases PI by 6 times and Delivers 200% Production Increase in Carbonates
STIMULATION AFTER WATER SHUTOFF CARBONATE "Perfobore Increases Production by 4 times in Carbonate Reservoir with Proximity of Water
THIN-BED STIMULATION CARBONATE "Perfobore Increases Production by 10X in Oil Rims with Low Permeable Reservoir with Proximity of Gas Cap
69 FT. LENGTH CHANNEL CARBONATE "Perfobore Increases Oil Production by 3X in 14,000ft Well in Carbonate Reservoir With Proximity of Water